Staining Lodge Golf Course & Wedding Venue

Staining Lodge required a complete mechanical overhaul to support its dual expansion as a premier golf clubhouse and high-capacity wedding venue. The project demanded a high-efficiency, multi-zone heating and plumbing network capable of balancing the daily comfort of club members with the heavy, intermittent demands of large event crowds.

The Showcase Features

The Challenge

  • Diverse Thermal Loads: Balancing continuous office heating, rapid-response event space warming, and high-volume hot water delivery.
  • Complex Footprint: Integrating infrastructure across existing clubhouse zones, new office builds, and a high-exposure Glasshouse function room.
  • Peak Demand Pressures: Engineering a plumbing system to handle hundreds of wedding guests simultaneously during peak reception intervals.

 

The Solution

High-Efficiency Plantroom Upgrade

  • Twin Boiler Configuration: Installed two commercial-grade boilers operating in cascade to maximize seasonal efficiency and provide built-in system redundancy.
  • Low Loss Header Integration: Implemented a low loss header to separate the primary boiler circuit from secondary distribution loops, ensuring hydraulically balanced, constant flow rates.

 

Advanced Multi-Zone Space Heating

  • Underfloor Heating (UFH): Deployed four independent UFH zones across high-traffic public areas, including the Entrance, Bar, Atrium, and main Clubhouse. This delivers gentle, radiant warmth and eliminates bulky radiators to maximize usable floor space.
  • Radiator Circuit: Installed a dedicated, high-temperature radiator loop to provide responsive, localized climate control for subsidiary rooms and administrative offices.
  • Air Handling Unit (AHU) Integration: Connected a high-output AHU to serve the glasshouse function room, combating heat loss from the extensive glazing and ensuring rapid warm-up times before events.

Commercial Plumbing & Public Services

  • Hot Water Storage: Integrated high-capacity unvented cylinders to guarantee immediate, high-pressure domestic hot water delivery across the property.
  • Bar & Kitchen Infrastructure: Outfitted the commercial kitchens and main bars with dedicated, high-flow hot and cold water supplies, alongside robust waste drainage networks.
  • Sanitaryware Fit-Out: Completed a full mechanical installation for public toilets, premium washrooms, and member shower facilities, utilizing water-efficient fixtures designed for heavy commercial use.

.

The Results

The new mechanical infrastructure seamlessly unites the venue’s rustic charm with modern efficiency.

By zoning the heating pathways, Staining Lodge can now isolate unused areas during quiet weekdays, significantly cutting energy overheads while guaranteeing a luxury experience for weekend wedding parties.

 

Like what you see get in touch?

Fill out this quick form and we will be in touch.